What Actually Happens During a Full Site Migration, Start to Finish

A realistic, step-by-step account of what a proper website migration involves, from the first copy to the moment the old host gets switched off.

By Casey Payne··3 min read

"We'll migrate it for you" is a reassuring sentence and a vague one. Here is what it actually involves, in the order it actually happens, so it stops being a leap of faith.

Day one: copying, not switching

The migration starts with a complete copy of everything on the current host: every file, the full database, and every setting that affects how the site behaves. Nothing about the live site changes yet. The old host keeps serving visitors exactly as before while the copy happens quietly in the background.

Day one or two: rebuilding it somewhere private

That copy gets rebuilt on the new host, but not in public. It lives at a private, temporary address that only the migration team can see, so it can be checked properly before anyone else ever encounters it.

The testing, specifically

This is the step that gets skimmed over in most descriptions of a migration, and it is the one that actually prevents surprises. Testing means clicking through the real site: does every page load, does the contact form actually send, does checkout complete if there is one, does the search work, do logged-in accounts still work. A site that "loads fine" and a site that "works" are different claims, and only the second one is the actual bar.

Email gets checked separately and just as carefully, since it is often on a different system entirely and easy to overlook while attention is on the website.

The cutover

Once the private copy passes every check, DNS gets pointed at the new host. Done properly, this is a quiet moment rather than a dramatic one: visitors requesting the site a minute before and a minute after the switch both get a working page, because the new one was already proven before anyone was sent to it.

The window right after

The old host stays available for a defined period rather than being cancelled immediately. If anything unexpected turns up once real traffic hits the new setup, rather than test traffic, there is a safety net rather than a scramble.

What a rollback actually looks like, if it is ever needed

Pointing DNS back at the old host, which is why it is kept running rather than shut down the moment the new one goes live. This is the entire reason the old side is not switched off on day one: a migration that cannot be undone is a much riskier thing to attempt than one that can.

Decommissioning

Once the new site has run cleanly for the agreed window, and only then, the old hosting account gets cancelled. Not before, no matter how well the cutover appeared to go.

Where this sits with us

Migrations to Squish hosting are handled by us rather than handed to the customer as a checklist, following exactly the sequence above: copy, build privately, test thoroughly, cut over, keep the old side running as a safety net, then decommission. The point of writing out each step is that a migration should never require trusting a promise. It should be possible to ask, at any point, what stage things are at, and get a specific answer.

If a migration is coming up: ask whoever is doing it what the testing step actually covers, by name (forms, checkout, search, logins). The answer tells you a great deal about how carefully the rest of it will be handled.